RM Watson has been engaged by Dexus to deliver a wholesale refurbishment of the rooftop membrane to the iconic 25 Martin Place.
RM Watson, in partnership with Arup have designed a site specific three-layer torch on membrane system which will be installed to the entire rooftop spanning 1,500m2.
Works are currently underway with practical completion scheduled for July 2022.