The Trio Apartments development in Camperdown consists of three interconnected residential towers (Trio North, Central, and South),featuring distinct lobby entrances and extensive facade elements.
Following the issuance of a Fire Safety Order from the City of Sydney Council, RM Watson was engaged to deliver a comprehensive cladding replacement program to satisfy the requirements of the Fire Order to ensure the safety of the building occupants.
Scope of Works:
- Complete removal and replacement of existing Aluminium Composite Panel (ACP) cladding across all three buildings.
- Installation of new 3mm solid aluminium cladding system to match original architectural intent.
- Remediation works across multiple elevations including Booth Street, Alexander Drive, and Stirling Circuit.
- Specialised treatment of various architectural features including the green wall interface and entrance foyers.
- Complex access solutions to manage material handling across a multi-level development.
Technical Challenges:
- Multiple cladding types with varying core compositions required specific removal methodologies.
- Interface management with existing building elements including louvre screens, building services, and balustrades.
- Maintenance of building operations and resident access throughout the remediation process.
Our team developed specific methodologies for each building area, considering the unique structural elements and access requirements of the reinforced concrete structure.